Property Name
Management Commencement Date, HMP Date, Lead Volunteer |
2007 |
Month |
J |
F |
M |
A |
M |
J |
J |
A |
S |
O |
N |
D |
Bumann
Management responsibility begins:
HMP preparation date:
Lead Volunteer/Board Member:
__________________________________ |
|
Standard Site Visit |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
Coler
Management responsibility begins:
HMP preparation date:
Lead Volunteer/Board Member:
__________________________________ |
|
Standard Site Visit |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Greenlands
Management responsibility begins: 11/1/2006
HMP preparation date: 1/13/2004
Lead Volunteer/Board Member:
__________________________________ |
|
Standard site visit: Site assessment (edge effects; exotic species and trash removal; brief bio-survey with focus on sensitive species) / Maintenance / Photo documentation
Note: all below site visits will incorporate site assessment, and will be conducted on alternate months |
x
|
x
|
x
|
x
|
x
|
x
|
Spring avian survey: Avifauna inventory during April or May (focus on CAGN) |
|
|
|
c |
|
|
|
|
|
|
|
Vegetation assessment: CNPS Rapid Assessment / Rare Plant Inventory |
c
|
c
|
Exotic species control: Removal of the exotic species to the acceptable level as indicated in section F of the HMP |
c |
c
|
Trash removal: Removal of all trash within the preserve |
x, v
|
Annual report submitted to City of San Marcos Planning Department, USFWS, and CDFG |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Leriche
Management responsibility begins: 8/2006
HMP preparation date: n/a
Lead Volunteer/Board Member:
__________________________________ |
|
Standard site visit |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Onyx Ridge
Management responsibility begins: 8/1/2007
HMP preparation date: November 2005
Lead Volunteer/Board Member:
__________________________________ |
|
Site inspection and preparation of a schedule and work plan (Any time during grading or post-grading of home site pads) |
|
|
|
|
|
|
|
|
|
|
|
|
Fencing and Signage of Lots 1-9 Open Space Easement. (Any time prior to grading of lots) |
|
|
|
|
|
|
|
|
|
|
|
|
Close Lot 8 Trail (Any time during grading or post grading of home site pads) |
|
|
|
|
|
|
|
|
|
|
|
|
Revegetate Lot 8 Trail |
|
|
|
|
|
|
|
|
Monitor regrowth |
x
|
x
|
x
|
x
|
Maintain fencing and signage of open space easement |
x
|
x
|
x
|
x
|
Fire Prevention Measures |
c
|
c
|
c
|
c
|
Exotic Vegetation Removal (to be implemented upon approval of weed control plan by wildlife agencies) |
c
|
c
|
c
|
c
|
Remove debris and trash |
x,v
|
x,v
|
x,v
|
x,v
|
Collect general biological data and vegetation community health data in year 1 |
c
|
c
|
c
|
c
|
Collect human impacts information |
x
|
x
|
x
|
x
|
Conduct spring time nocturnal survey on annual basis |
|
|
c |
|
|
|
|
|
|
|
Conduct spring time senstive plant and animal species survey on an annual basis (anytime or as dictated by life history (i.e., flowering time)) |
|
|
c |
|
|
|
Conduct breeding season coastal california gnatcatcher surveys (Year 1 then every two years thereafter) (anytime between Feb 15 and July 1 ) |
|
c |
|
|
|
|
|
|
Conduct vegetation community sampling in sage scrub and chaparral habitats (Year 1 then every 5 years thereafter)(anytime outside of the Gnatcatcher nesting seaon) |
c |
Coordinate and/or meet with the wildlife agencies every 10 years to discuss changes in vegetation communities and ecological function and wildlife habitat quality and HMP revisions |
|
|
|
|
|
|
|
|
|
|
|
|
Annual report submitted to County of San Diego, Resource agencies, subdivider and HOA |
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Quarry
Management responsibility begins:
HMP preparation date:
Lead Volunteer/Board Member:
__________________________________ |
|
Standard Site Visit |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
San Elijo Ridge
Management responsibility begins: 11/1/2006
HMP preparation date: 1/13/2004
Lead Volunteer/Board Member:
__________________________________ |
|
Standard site visit: Site assessment (edge effects; exotic species and trash removal; brief bio-survey with focus on sensitive species) / Maintenance / Photo documentation
Note: all below site visits will incorporate site assessment, and will be conducted on alternate months |
x
|
x
|
x
|
x
|
x
|
x
|
Spring avian survey: Avifauna inventory during April or May (focus on CAGN) |
. |
. |
. |
c |
. |
. |
. |
. |
. |
. |
. |
Vegetation assessment: CNPS Rapid Assessment / Rare Plant Inventory |
c
|
c
|
Exotic species control: Removal of the exotic species to the acceptable level as indicated in section F of the HMP |
c
|
c
|
Trash removal: Removal of all trash within the preserve |
x,v
|
Annual report submitted to City of San Marcos Planning Department, USFWS, and CDFG |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|